Al Raha Beach · Apartments
Al Rahba
Al Rahba comprises apartment towers in the island part of Al Muneera, Al Raha Beach.
AldarOfficial website
5 project imagesAt a glance
- Starting price
- Not provided
- Payment plan
- Not provided
- Handover
- Not provided
- Home types
- Apartments
- Bedrooms
- 2, 3 and 4
- Published sizes
- Not provided
Published information reviewed 14 October 2026. Prices and availability may have changed.
Homes
The Aldar community schedule identifies 2, 3 and 4 bedroom apartments in these towers. Confirm tower number, floor and drawing revision.
Request a measured drawing matched to the selected property and its current revision.
Image and floor plan notes
Floor plans were not published on the reviewed source page.
Payment details and buying notes
For a specific home, request a dated quotation with its payment calendar, charges and contractual delivery date.
Project gallery
5 imagesExplore all 5 project images
Project imagery includes marketing renders. It does not show verified construction progress.
Location
On the island side of Al Muneera. The canal separates its mainland and island precincts.
Documents and project tools
Al Muneera unit and building guide
Original community schedule distinguishes island and mainland towers.
Open sourceKnownable PDFBuyer facts and checklist
Knownable summary of the sourced facts, qualifications and documents to request. Independently prepared, not a developer offer.
Download buyer summaryLinks checked 14 October 2026. A current downloadable brochure and complete measured drawing set have not been verified.
Published amenities and surroundings
- Community pools
- Gym facilities
- Canal promenade
- Community beach
Features described in project material. Opening dates, access and charges depend on the release.
Details still needed
Our current files do not include:
- Unit and plot sizes
- Current price list
- Payment schedule
- Handover date
- Selected property drawings
- Official location plan
Construction progress, service charges and live inventory also need a current update.
Sources and update date
Reviewed 14 October 2026. Project guide based on the publications below.
- Aldar project information, checked 14 October 2026
- Abu Dhabi Off Plan project record, reviewed 22 September 2026