Skip to main content

Al Raha Beach · Apartments

Al Sana

Al Sana comprises apartment towers in the mainland part of Al Muneera, Al Raha Beach.

Aldar logoAldarOfficial website

Project enquiry

Al Sana

Interested in Al Sana?

Leave your details and our team can follow up about this project. Knownable is not the developer. An enquiry does not confirm availability or reserve a home.

View 5 images
Al Sana: project gallery image 15 project images

At a glance

Starting price
Not provided
Payment plan
Not provided
Handover
Not provided
Home types
Apartments
Bedrooms
1 and 2
Published sizes
Not provided

Published information reviewed 14 October 2026. Prices and availability may have changed.

Homes

The Aldar community schedule identifies 1 and 2 bedroom apartments in these towers. Confirm tower number, floor and drawing revision.

Request a measured drawing matched to the selected property and its current revision.

Image and floor plan notes

Floor plans were not published on the reviewed source page.

Payment details and buying notes

For a specific home, request a dated quotation with its payment calendar, charges and contractual delivery date.

Location

Al Raha Beach

On the mainland side of Al Muneera. The canal separates its mainland and island precincts.

    Historical community descriptions do not establish current facility access or the outlook from a particular apartment.

    Documents and project tools

    Links checked 14 October 2026. A current downloadable brochure and complete measured drawing set have not been verified.

    Published amenities and surroundings

    • Community pools
    • Gym facilities
    • Canal promenade
    • Community beach

    Features described in project material. Opening dates, access and charges depend on the release.

    Details still needed

    Our current files do not include:

    • Unit and plot sizes
    • Current price list
    • Payment schedule
    • Handover date
    • Selected property drawings
    • Official location plan

    Construction progress, service charges and live inventory also need a current update.

    Sources and update date

    Reviewed 14 October 2026. Project guide based on the publications below.

    Research standards