Skip to main content

Al Reem Island · Apartments

The Arc Tower

An apartment building in the Gate and Arc district on Al Reem Island.

Aldar logoAldarOfficial website

Project enquiry

The Arc Tower

Interested in The Arc Tower?

Leave your details and our team can follow up about this project. Knownable is not the developer. An enquiry does not confirm availability or reserve a home.

View 8 images
The Arc Tower: project gallery image 18 project images

At a glance

Starting price
Not provided
Payment plan
Not provided
Handover
Q2 2014
Developer publication
Home types
Apartments
Bedrooms
Studios, 1 and 2
Published sizes
Not provided

Published information reviewed 14 October 2026. Prices and availability may have changed.

Homes

The published collection includes studios, 1 and 2 bedroom options. Match the unit code and drawing revision to the selected property.

Request a measured drawing matched to the selected property and its current revision.

Image and floor plan notes

Floor plans were not published on the reviewed source page.

Payment details and buying notes

Handover note
Published portal target. Its date does not establish that this home has been handed over; obtain the current status.

For a specific home, request a dated quotation with its payment calendar, charges and contractual delivery date.

Location

Al Reem Island

The Arc Tower, Al Reem Island.

    Exact unit views, access rights and measured journey times are not verified by this page.

    Documents and project tools

    Links checked 14 October 2026. A current downloadable brochure and complete measured drawing set have not been verified.

    Published amenities and surroundings

    • 2 Public Pools
    • Children's Playground
    • Lazy River or Channel Pool
    • Movie Theatre Hall

    Features described in project material. Opening dates, access and charges depend on the release.

    Details still needed

    Our current files do not include:

    • Unit and plot sizes
    • Current price list
    • Payment schedule
    • Selected property drawings
    • Official location plan

    Construction progress, service charges and live inventory also need a current update.

    Sources and update date

    Reviewed 14 October 2026. Project guide based on the publications below.

    Research standards