4 project imagesAt a glance
- Starting price
- Not provided
- Payment plan
- Not provided
- Handover
- Q4 2027 Developer publication
- Home types
- Apartments
- Bedrooms
- Studio to 3
- Published sizes
- Not provided
Published information reviewed 14 October 2026. Prices and availability may have changed.
Homes and floor plans
The published collection includes studio to 3 bedroom options. Match the unit code and drawing revision to the selected property.
Developer brochure layouts are indicative and subject to change. Match the drawing revision and area schedule to the selected home.
Payment details and buying notes
- Handover note
- Published portal target, not a contractual delivery commitment. Confirm the selected phase.
For a specific home, request a dated quotation with its payment calendar, charges and contractual delivery date.
Project gallery
4 imagesExplore all 4 project images
Project imagery includes marketing renders. It does not show verified construction progress.
Location
Nouran Living, Saadiyat Island.
Documents and project tools
Nouran Living official brochure
53 pages. Published material; confirm the edition and selected unit.
Open sourceVirtual tourOfficial interactive project tour
Explore the developer viewer. This is a development illustration, not a construction inspection.
Open sourceKnownable PDFBuyer facts and checklist
Knownable summary of the sourced facts, qualifications and documents to request. Independently prepared, not a developer offer.
Download buyer summaryLinks checked 14 October 2026. Publisher documents are indicative. The complete selected unit contract and current charge schedule are not verified.
Published amenities and surroundings
- The Courtyard
- Cycle Vault
- Multipurpose halls
- Indoor & Outdoor Children's Play Areas
- The Splash (Kids’ Swimming Pool)
- Stride Lane
- Padel Point
- Indoor & Outdoor Gym
Features described in project material. Opening dates, access and charges depend on the release.
Details still needed
Our current files do not include:
- Unit and plot sizes
- Current price list
- Payment schedule
- Official location plan
Construction progress, service charges and live inventory also need a current update.
Sources and update date
Reviewed 14 October 2026. Project guide based on the publications below.
- Aldar project information, checked 14 October 2026
- Abu Dhabi Off Plan project record, reviewed 22 September 2026
