Masdar City · Apartments / Duplexes / Triplexes
Ville 11
A completed 111 home residential building on Masdar Boulevard, with published two to four bedroom layouts.
Burtville DevelopmentsOfficial website
6 project imagesAt a glance
- Starting price
- Not provided
- Payment plan
- Not provided
- Handover
- Completed July 2026 Developer publication
- Home types
- Apartments, Duplexes, Triplexes
- Bedrooms
- 2 to 4
- Published sizes
- 960 to 2,299 sq ft published totals, including outdoor area
Published information reviewed 14 October 2026. Prices and availability may have changed.
Homes and floor plans
The brochure includes two bedroom apartments and duplexes, three bedroom duplexes and a triplex, and a four bedroom layout. The examples below are developer brochure drawings; match their revision and area definitions to the selected home.
| Home | Bedrooms | Published total area |
|---|---|---|
| 2 bedroom type A | 2 | 982 to 1,388 sq ft total |
| 2 bedroom type B | 2 | 960 to 1,650 sq ft total |
| 2 bedroom duplex type C | 2 | 1,090 to 1,365 sq ft total |
| 2 bedroom duplex type D | 2 | 1,033 to 1,536 sq ft total |
| 3 bedroom duplex type A | 3 | 1,321 sq ft total |
| 3 bedroom duplex type B | 3 | 2,299 sq ft total |
| 3 bedroom triplex type C | 3 | 1,713 sq ft total |
| 4 bedroom type A | 4 | 1,812 to 1,909 sq ft total |
Published project specifications
- Published unit count
- 111 homes
- Completion evidence
- Certificate reproduced in the July 2026 handover reportCertificate B1N-2023-007880-P01-C01, issued 31 July 2026, names project F-11 and plot 35. It was inspected in the developer PDF, not independently authenticated with the municipality.
Developer brochure layouts are indicative and subject to change. Match the drawing revision and area schedule to the selected home.
Image and floor plan notes
Images from this project’s official developer page include renders and illustrative scenes. Furnishing, views and amenities must be matched to the selected contract.
Payment details and buying notes
- Handover note
- Burtville’s July handover report records completion on 30 July 2026 and reproduces a full building completion certificate issued 31 July 2026. The project page still displays the original Q3 2027 target. This does not establish handover of a selected unit.
- Before taking possession
- Building completion and individual unit handover are different steps. Request the unit handover notice, snagging record, title or registration status, utilities activation and current service charge schedule.
For a specific home, request a dated quotation with its payment calendar, charges and contractual delivery date.
Project gallery
6 imagesExplore all 6 project images
Project imagery includes marketing renders. It does not show verified construction progress.
Location
Open full size planDeveloper location illustration from the official brochure, PDF page 8.
Masdar City on Masdar Boulevard, plot 35 (F11), sector SE45-01, as identified in the handover report.
Documents and project tools
Ville 11 brochure
Official developer publication covering the named project.
Open official sourceDeveloper PDF (6.1 MB)Ville 11 July 2026 handover report
Includes completed project photos and a reproduced municipal building completion certificate.
Open official sourceDeveloper brochure pagesPublished home area schedule
Brochure pages 15 to 18 include internal, outdoor and total areas by home type.
Open official sourceKnownable PDFBuyer facts and checklist
Knownable summary of the cited project publications, source differences and documents still needed.
Download buyer summaryLinks checked 14 October 2026. Official publications were retrieved and inspected. Missing unit and commercial details are listed below.
Published amenities
- Outdoor pool
- Children’s pool
- Rooftop café
- BBQ areas
- Health club
- Children’s play area
Features described in project material. Opening dates, access and charges depend on the release.
What to consider
- Published total areas include outdoor areas and vary by type. Use the internal and outdoor area breakdown for the selected home.
- A completion certificate does not confirm that every sale, title transfer or individual handover has finished.
Details still needed
Our current files do not include:
- Current unit quotation and payment calendar
- Approved service charge schedule and included services
- Current inventory or selected unit handover status
Construction progress, service charges and live inventory also need a current update.
Sources and update date
Reviewed 14 October 2026. Project guide based on the publications below.
Research standards