Zayed City · Townhouses
Casares at Bloom Living
Bloom Living’s third phase, consisting of two and three bedroom townhouses.
Bloom
1 project imagesAt a glance
- Handover
- Past target: Q2 2026 Developer publication
- Home types
- Townhouses
- Bedrooms
- 2 to 3
- Published sizes
- 1,292 to 1,841 sq ft total sellable area
Published information reviewed 15 October 2026. Prices and availability may have changed.
Homes and floor plans
Two and three bedroom townhouses. The Casares brochure provides five measured examples, covering middle and end units with total sellable areas from 120 to 171 sq m.
| Home | Bedrooms | Brochure total sellable area |
|---|---|---|
| Type 2M middle townhouse | 2 | 1,335 sq ft / 124 sq m |
| Type 2M-1 middle townhouse | 2 | 1,292 sq ft / 120 sq m |
| Type 2E end townhouse | 2 | 1,324 sq ft / 123 sq m |
| Type 3M middle townhouse | 3 | 1,625 sq ft / 151 sq m |
| Type 3E end townhouse | 3 | 1,841 sq ft / 171 sq m |
Bloom branded Casares brochure, pages 10 to 16. The publisher identity and named layouts were inspected; the file is hosted by a property portal. Casares brochure hosted by Property Finder
Developer brochure layouts are indicative and subject to change. Match the drawing revision and area schedule to the selected home.
Image and floor plan notes
Official developer project imagery may include renders. Drawings are examples, not an approved selected unit schedule.
Payment details and buying notes
- Broker advertised from note
- OIA’s project page headline, checked 15 October 2026. The narrative separately quotes an AED 1.7 million starting figure. The page does not reconcile the two figures. No unit number, price list date or current availability is verified; request a dated unit quotation.
- Payment plan note
- Broker schedule: 5% on booking, 35% during construction, 40% on handover and 20% after handover. Checked 15 October 2026. The page’s simplified plan label does not describe all of these milestones. A current developer offer and dated instalment calendar have not been verified.
- Handover note
- The construction page still states a Q2 2026 handover target; the 2023 launch had said Q1 2026. Both dates have passed. The inspected official sources do not establish a revised date or confirm that handover has begun.
- Developer construction update
- The official construction page reports over 94% progress. Its measurement date is not established by the page text. This is developer reporting, not an independent inspection or proof of unit handover.
For a specific home, request a dated quotation with its payment calendar, charges and contractual delivery date.
Project gallery
1 imagesExplore all 1 project images
Project imagery includes marketing renders. It does not show verified construction progress.
Location
Open full size planCasares brochure, PDF page 6, hosted by Property Finder. The plan identifies the phase context; obtain the approved plot drawing for a selected home.
Bloom Living, Zayed City, Abu Dhabi Emirate.
Documents and project tools
Casares at Bloom Living construction update
Developer progress page. Its published target and progress figure may refer to different dates.
Open sourceDeveloper webpageOfficial Casares at Bloom Living source
Primary source used for the published facts on this page.
Open sourceBroker webpageOIA Properties: Casares at Bloom Living
Broker project publication used for the explicitly labelled advertised price. Its marketing estimates do not replace developer facts.
Open sourceDeveloper branded PDF via Property FinderCasares developer branded brochure via Property Finder
Named Casares brochure with phase master plan and five measured townhouse layouts. Third party hosted copy; publication revision date is not established.
Open sourceKnownable PDFBuyer facts and checklist
Knownable summary of developer facts, labelled broker observations, source differences and documents still needed.
Download buyer summaryLinks checked 15 October 2026. Developer publications are used first. Broker estimates and third party hosted documents are identified individually. The Knownable summary preserves those distinctions.
Published community facilities
- Community parks and walking trails
- Lake and recreation facilities
- Planned retail and dining
- Planned schools and places of worship
Features described in project material. Opening dates, access and charges depend on the release.
Details still needed
Our current files do not include:
- Current unit quotation and available inventory
- Approved service charge schedule and included services
- Approved drawing revision and plot schedule for the selected home
Construction progress, service charges and live inventory also need a current update.
Sources and update date
Reviewed 15 October 2026. Project guide based on the publications below.
- Bloom Holding: Casares at Bloom Living
- OIA Properties: Casares at Bloom Living
- Casares developer branded brochure via Property Finder