Skip to main content

Zayed City · Villas / Townhouses

Toledo at Bloom Living

Bloom Living’s second phase, with townhouses and detached villas. Bloom records the start of handover in July 2026.

Bloom

Project enquiry

Toledo at Bloom Living

Interested in Toledo at Bloom Living?

Leave your details and our team can follow up about this project. Knownable is not the developer. An enquiry does not confirm availability or reserve a home.

View 1 images
Toledo at Bloom Living: developer project imagery1 project images

At a glance

Broker advertised from
AED 2,200,000
Broker publication: OIA Properties
Payment plan
Not provided
Handover
Handover began July 2026
Developer publication
Home types
Villas, Townhouses
Bedrooms
2 to 5
Published sizes
See the type specific published areas below

Published information reviewed 15 October 2026. Prices and availability may have changed.

Homes and floor plans

Two and three bedroom townhouses and three to five bedroom detached villas. The launch publication gives townhouse sizes of 120 to 171 sq m and villa sizes of 254 to 428 sq m.

Published home options
HomeBedroomsBrochure example area
2 bedroom middle townhouse Type 2M2124 sq m total sellable area
3 bedroom middle townhouse Type 3M3151 sq m total sellable area
3 bedroom villa3254 sq m total sellable area
4 bedroom villa4316 sq m total sellable area
5 bedroom villa5428 sq m total sellable area

Published project specifications

Bloom Living release
2

View the published specification

Toledo at Bloom Living: official brochure layouts, PDF page 29Reference layout · Select to enlarge
Toledo at Bloom Living: official brochure layouts, PDF page 37Reference layout · Select to enlarge
Toledo at Bloom Living: official brochure layouts, PDF page 44Reference layout · Select to enlarge
Toledo at Bloom Living: official brochure layouts, PDF page 48Reference layout · Select to enlarge
Toledo at Bloom Living: official brochure layouts, PDF page 55Reference layout · Select to enlarge

Toledo at Bloom LivingToledo at Bloom Living: official brochure layouts, PDF page 29 · 1 / 5

Open full image

Reference plan only. Confirm the unit, phase, dimensions and current specification with the developer.

Developer brochure layouts are indicative and subject to change. Match the drawing revision and area schedule to the selected home.

Image and floor plan notes

Official developer project imagery may include renders. Drawings are examples, not an approved selected unit schedule.

Payment details and buying notes

Broker advertised from note
OIA’s project page headline, checked 15 October 2026. The same page refers to a launch figure of AED 1.7 million. No unit number, price list date or current availability is verified; request a dated unit quotation.
Handover note
Bloom’s corporate history records the start of handover in July 2026 and its construction page reports 100% progress. The original launch target was Q2 2025. Confirm the selected unit’s handover and outstanding obligations.

For a specific home, request a dated quotation with its payment calendar, charges and contractual delivery date.

Location

Official Toledo at Bloom Living location or site planOpen full size plan
Official Toledo at Bloom Living location or site plan

Official developer brochure, PDF page 24. Confirm the selected plot and drawing revision.

Zayed City

Bloom Living, Zayed City, Abu Dhabi Emirate.

    Documents and project tools

    Links checked 15 October 2026. Developer publications are used first. Broker estimates and third party hosted documents are identified individually. The Knownable summary preserves those distinctions.

    Published community facilities

    • Community parks and walking trails
    • Lake and recreation facilities
    • Planned retail and dining
    • Planned schools and places of worship

    Features described in project material. Opening dates, access and charges depend on the release.

    Details still needed

    Our current files do not include:

    • Current unit quotation and available inventory
    • Approved service charge schedule and included services

    Construction progress, service charges and live inventory also need a current update.

    Sources and update date

    Reviewed 15 October 2026. Project guide based on the publications below.

    Research standards