Zayed City · Townhouses
Olvera at Bloom Living
Bloom Living’s sixth phase, with two and three bedroom townhouses.
Bloom
1 project imagesAt a glance
- Handover
- Q3 2027 Developer publication
- Home types
- Townhouses
- Bedrooms
- 2 to 3
- Published sizes
- 1,303 to 1,841 sq ft across the five inspected drawings
Published information reviewed 15 October 2026. Prices and availability may have changed.
Homes and floor plans
Two and three bedroom townhouses. Five Olvera branded drawing schedules identify middle and end unit types, with total sellable areas from 121 to 171 sq m. Two complete preview sheets are available below.
| Home | Bedrooms | Drawing total sellable area |
|---|---|---|
| Type 2M townhouse | 2 | 1,346 sq ft / 125 sq m |
| Type 2M-1 townhouse | 2 | 1,303 sq ft / 121 sq m |
| Type 2E townhouse | 2 | 1,334 sq ft / 124 sq m |
| Type 3M townhouse | 3 | 1,626 sq ft / 151 sq m |
| Type 3E townhouse | 3 | 1,841 sq ft / 171 sq m |
The five Olvera branded drawings print the total sellable areas shown here. These differ from the broker narrative’s broader 1,296 to 1,844 sq ft range. Use the drawing for the selected type. OIA Properties: Olvera layout drawings
Olvera branded previews hosted by OIA Properties. Only the two complete sheets are displayed; higher resolution approved drawings and other full type sheets remain to be obtained.
Image and floor plan notes
Official developer project imagery may include renders. Drawings are examples, not an approved selected unit schedule.
Payment details and buying notes
- Broker advertised from note
- OIA’s project page headline, checked 15 October 2026. The narrative separately quotes an AED 1.8 million starting figure. The page does not reconcile the two figures. No unit number, price list date or current availability is verified; request a dated unit quotation.
- Payment plan note
- Broker schedule: 5% on booking, 45% during construction, 30% on handover and 20% after handover. Checked 15 October 2026. The page’s simplified plan label does not describe all of these milestones. A current developer offer and dated instalment calendar have not been verified.
- Handover note
- Published developer target, not a selected unit contractual date. Confirm the current agreement and delivery notice.
For a specific home, request a dated quotation with its payment calendar, charges and contractual delivery date.
Project gallery
1 imagesExplore all 1 project images
Project imagery includes marketing renders. It does not show verified construction progress.
Location
Open full size planCommunity context from the official brochure. This map does not identify the selected phase boundary or unit plot.
Bloom Living, Zayed City, Abu Dhabi Emirate.
- No phase specific site drawing was verified in the inspected official material.
Documents and project tools
Official Olvera at Bloom Living source
Primary source used for the published facts on this page.
Open sourceBroker webpageOIA Properties: Olvera at Bloom Living
Broker project publication used for the explicitly labelled advertised price. Its marketing estimates do not replace developer facts.
Open sourceKnownable PDFBuyer facts and checklist
Knownable summary of developer facts, labelled broker observations, source differences and documents still needed.
Download buyer summaryLinks checked 15 October 2026. Developer publications are used first. Broker estimates and third party hosted documents are identified individually. The Knownable summary preserves those distinctions.
Published community facilities
- Community parks and walking trails
- Lake and recreation facilities
- Planned retail and dining
- Planned schools and places of worship
Features described in project material. Opening dates, access and charges depend on the release.
Details still needed
Our current files do not include:
- Phase specific boundary and selected plot plan
- Current unit quotation and available inventory
- Approved service charge schedule and included services
- Complete approved drawing set and selected plot schedule
Construction progress, service charges and live inventory also need a current update.
Sources and update date
Reviewed 15 October 2026. Project guide based on the publications below.
Research standards